Remove Consumer Goods Remove Cycle time Remove Industry 4.0 Remove Process manufacturing
article thumbnail

Sumitomo (SHI) Demag LSR Double-bill at Fakuma 2023

i4.0 today

where insulation is required, as well as in medical and healthcare products and the consumer goods sector. In a cycle time of just 17 seconds, this IntElect LSR package manufactures 256 individual 0.06-gram The Elastosil LR 3844/50 material from Wacker Chemie is dispensed via a sophisticated yet compact Industry 4.0-ready

article thumbnail

Digital transformation tools improve plant sustainability and maintenance

Control Engineering

Preventive maintenance can locate leaks early and calculate proper pressure ratios while maintaining cycle time. To do this requires having the right information at the right time. These directives enable personnel to resolve issues before they can slow or shut down operations.