Avoiding Data DOWNTIME: Applying Lean Principles to Data in Aerospace & Defense
iBASEt
MARCH 13, 2025
If engineering stores work instructions in a PLM instead of a Manufacturing Execution System (MES), shop floor operators may be idle while workflows are executed that are not germane to engineering definition. Information should be accessible at the point of use, and data should only originate once.
Let's personalize your content